Millennium Suites Hotel
Project's Location
Guinea
Year of Construction
2012
Closed Area
8200 m²
APEC Smart Steel Structure Systems were chosen for the project design of all load bearing systems and their manufacturing in the construction of the Seven Floored Millennium Suites Hotel, built in Guinea, which is a composite construction of light steel and heavy steel systems.